There are two types of alterations related to CLI ECA application:
- Sanitary (sewage) Collection System: all connected sewage collection works within the Town of Pelham right-of-way (ROW) and owned and/or operated by the Town of Pelham.
- Storm Management System: all connected stormwater management works within the Town of Pelham right-of-way (ROW) and owned and/or operated by the Town of Pelham.
You need to request a CLI ECA alteration for the following types of projects.
Wastewater (Sanitary) Infrastructure Alteration Projects – Additions, Modifications, Replacements and Extensions as defined under CLI ECA 072-W601
- Alterations for Separate Sewers, Nominally Separate Sewers and Forcemains
- Alterations for Combined Sewers, Partially Separated Sewers and Combines Sewage Storage Tanks and Structures
- Alterations to Components for the Municipal Sewage Collection System
- Alterations to Equipment with Emissions to the Air
Reference CLI ECA 072-W601 for more details on specific alteration types.
Stormwater Infrastructure Alterations Projects – Additions, Modifications, Replacements and Extensions as defined under CLI-ECA 072-S701
- Alterations to Storm Sewers, Ditches or Culverts
- Alterations to Stormwater Management Facilities
- Alterations for Third Pipe Collection Systems
Reference CLI ECA 072-S701 for more details on the specific alteration types.